
For years, mining and other industries have faced lengthy 6–18 month wait times for CASA to process BVLOS approvals. Every new site, or even small variations to existing ones, meant more paperwork, more delays, and survey crews left waiting.
Now, things are changing. CASA’s newly announced Broad Area BVLOS Operations Trial (TMI 2025-03) is set to cut through the bottlenecks and fast-track operations. It’s a major shift for ReOC holders looking to scale safely and efficiently.
Download the guide to get a clear breakdown of CASA’s new trial, including:
If you’d prefer to talk it through, get in touch with our team - our Chief Remote Pilot (CRP) can walk you through whether your sites qualify and how to structure approvals across multiple regions.